The Costing Manager role involves overseeing and managing the cost estimation process for solar energy projects. Their main responsibility is to ensure accurate and efficient cost analysis throughout the project lifecycle.
Job Accountabilities (Primary job responsibilities but not limited to)
Job Purpose / Objectives
He/She is responsible for conducting thorough cost estimations for solar energy projects. They analyze project requirements, review plans and specifications, and use historical data to calculate the projected costs accurately. This includes estimating costs for solar panels, inverters, mounting systems, electrical components, labor, permits, and other associated expenses.
Conduct site assessment and preliminary project execution plan.
Feasibility study and technical assessments: irradiation analysis (PVSyst), engineering gross design and costin
Prospective clients&039; profiling: analysis of energy consumption patterns, load curves, tariff structur
Reponse to technical clarifications
Liaise with clients on technical requirements
Proposal drafting and answers to tenders
Responsible for technical presentation decks upgrades
Responsible for handover to project execution team
Support contract drafting
Provide engineering support as needed to the project development, engineering and project management teams:
Conduct research on new solutions and linked topics
Inquire on regulatory codes in SEA countries relevant to PV installation
Support internal processes (incl. ISO 45001/9001)
Responsible for engineering tool upgrade and development
Carry out site visits to verify roof layout as provided by client or by sales team
Solar PV Design and Engineering with good engineering practice and in compliance with IEC 60364 or local equivalent and local regulatory codes relevant to Solar PV Installations
Secondary job responsibilities
The Employee will also be responsible for liaising with clients, legal agencies, suppliers, services providers and any other partners with which the Employer work or will be working.
Liaise with other team for feedback in design and costing for continuous improvement