Molex Vietnam has been operating its first factory at Thang Long Industrial Park I since 2007. Currently, Molex is investing in a NEW FACTORY located at Thang Long Industrial Park II, Hung Yen province, with a total investment of approximately 145 million USD, covering an area of 100,000 m² and divided into 3 phases. This factory will produce high- tech products, such as high- speed cables and optical devices.
MOLEX, a brand under KOCH Industries with its headquarters in LISLE (USA), is one of one of the world’s leading interconnector manufacturer. Molex creates connections for life by providing technologies that transform the future and improve lives. With a presence in over 40 countries, Molex offers a full range of products, services, and connectivity solutions for the data communications, healthcare, industrial, automotive, and consumer electronics industries. We not only develop solutions for customers but also Create Connections for Life.
PRIMARY PURPOSE:
Manage the reliability tests for product qualification primarily at the Vietnam plant – Hung Yen branch. The test engineer ensures smooth laboratory operations by continuously improving
reliability efficiency
,
capability, and technology.
DUTIES & RESPONSIBILITIES:
Review reliability lab reports to support new product development, ensuring report integrity and compliance with the reliability lab system.
Source and coordinate external lab tests when internal capabilities or capacities are insufficient.
Analyze test results to determine the root cause of defects, safety risks, and performance issues.
Assist the manager in maintaining the laboratory in optimal safety and operating conditions (Facility, Test equipment, Safety, 5S, etc.).
Prepare and implement reliability tests according to schedule, accelerating the qualification process for timely product release.
Coordinate technical efforts with plant engineers and design engineers.
Manage equipment calibration in plants and collaborate with calibration vendors.
Create test plans to review product/process risks and eliminate these risks before product release.
Establish a reliability lab system and review test methods, including appropriate evaluation methods and enhancing test efficiency.