We are looking for a proactive and detail- oriented Engineering Coordinator Intern to support our Lab Testing team. In this role, you will assist with product testing support tasks within the new product development lifecycle, including preparing the test write- up, test document compilation, test result analysis, test report, finalizing report and data collection. This is a great opportunity to gain hands- on experience in product testing and engineering support.
KEY RESPONSIBILITIES
Test Write- Ups
Organize and store documents in the testing folder and upload them to the LMA system.
Coordinate with the CAD team when needed to create build and test setup drawings.
Review and compile all relevant drawings, documents, and specifications for engineers.
Ensure data accuracy and completeness in accordance with internal guidelines.
Test Document Compilation
Combined and standardized all documents into a single PDF package for accurate and consistent lab test setup.
Ensure the accuracy and completeness in accordance with internal guidelines.
Store all relevant documents in the testing folder and upload them to the LMA system.
Review and verify all required documents: Test Information, Production Drawing, Test Set- up Drawing, and any additional materials to ensure they are the latest versions.
Test Result Analysis
Ensure the accuracy and completeness in accordance with internal guidelines.
After testing, assist engineers in processing raw data and generating test result graphs or defining the load deflection at ASD/LRFD/LSD/Nominal Loads.
Use calculation templates to input test information, results, and assist engineers in analyzing data to determine product capacity.
Test Report
Consolidate test information, drawings, results, photos, and analysis into a standardized Word draft report after engineer approval of test results.
Organized and stored all related documents in the testing folder and copied the draft report to the Engineering folder.
Ensure the accuracy and completeness in accordance with internal guidelines.
Finalizing Test Report and Data Collection
Enter test information and test results into the database accurately.
Maintain a high standard of professionalism throughout this process.
Review the completed test reports, send reminders to the engineer if PDFs are missing, and update status in LMA as needed to ensure all information is organized and accessible.